The 2019 Pipeline Replacement Project began in June 2019 and was completed by the end of November 2019. For more information on pipeline replacement projects, email outreach@dwa.org or call (760) 323-4971, ext. 184. 

Area 1: Sunmor – Complete

The image shows an aerial map with streets labeled in yellow, indicating a neighborhood layout with various roads.

Area 2: Old Las Palmas – Complete

A map showing streets and neighborhoods with highlighted road names, including W Hermosa Place and Prescott Drive.

Area 3: El Mirador – Complete

The image shows a detailed map of a residential area with street names and layouts, including E The Palms Street and E Chia Road.

Area 4: Avenida Palos Verdes – Complete

The image shows a map segment featuring streets, businesses, and landmarks in a residential area, likely in Palm Springs, CA.